Projects

Click to enlarge image

Client Contract Value (USD) Period of Performance Type of Work Performed Location Year
AMEC 2.402  million 5 months BUILDING REFURBISHMENT TAJI AVIATION,PHASE 4 ,ZONE I 2004
AMEC 3.018million 6 months UTILITY PROJECT, ELECTRICAL,WATER AND SEWER NETWORKS TAJI AVIATION PHASE 4 2004
AMEC 1.013 million 4 months ROAD PAVEMENTS AND CONCRETE WALKWAYS TAJI AVIATION PHASE 4 2004
AMEC  260000   6 months BRC FENCING WITH TOP RAILS AND CONCERTINA WIRES TAJI BASE PHASE 5
POLICE ACADEMY
2005
AMEC 2.771 million 2.531 million 4 MONTHS
4 months
BUILDINGS REFURBISHMENT TAJI BASE
DEPOT , POD 6
2005
AMEC 5.5  million 5 months BUILDING REFUEBISHMENT TAJI BASE DEPOT, POD 4 2006
ANHAM 322,000 3 Months Modifying and refurbishment  of the main maintenance shop for heavy and light vehicles Taji Base, near Tent City 2006
AMEC 6.123 million 7 months Refurbishment and New Construction for the 3-9 mechanical Brigade Taji Aqua Zone 2007
Washington Group 331,198.85 120 Days water & sewer network and Lift Station for the Log, Battalion Taji Base 2007
Washington Group 1,894,899.84 150 Days Ammunition Storage Point Taji Base 2007
CH2M HILL 4.51 million 6 months
Being Handed-over
New Construction of Warehouses, Gymnasium, Fuel Point, Lift Station with Force Main, H.T. Power Distribution Network for 4th Recon Regiment 9th Brigade Taji Aqua Zone 2007
AMEC 1.07 million 150 Days Refurbishment of the Main Wheel Facility of Bldg 1200, POD 6 Taji Base 2007
CH2M HILL 2.564 million 180 Days Construction of Military Intelligence Academy Buildings Taji Base 2008
AMEC 213.500.00 M 3 Months Water Treatment Plant Taji Base 2008
AMEC 331.683.50 M 7 Months Water Treatment Plant Taji Base 2008